Consult & Transform
Plan cloud infrastructure around workload needs
Cloud infrastructure needs clear ownership, cost visibility and an operating model. Azure consultancy reviews the workloads you need to run and establishes a design that accounts for security, resilience and ongoing management.
The challenge
Start with the right problem
Moving infrastructure does not automatically simplify it. Dependencies, access, networking, backup and support responsibilities should be understood before deployment.
Recognise this? A short conversation is usually the quickest way to agree a sensible next step.
Discuss your migration projectScope
What the engagement can cover
Projects are scoped separately, with their own plan, acceptance criteria and handover.
-
Assessment and design
Establish workload, identity, networking and availability requirements.
-
Implementation
Scope subscriptions, resources, access and configuration.
-
Operations handover
Agree documentation, monitoring, backup and cost-management responsibilities.
How it works
A clear route from discussion to delivery
Discover requirements, design the target environment, validate costs and dependencies, implement with agreed change controls and hand over the operating information.
-
Step 1: Understand
Discuss your business, users, systems and immediate concerns.
-
Step 2: Prioritise
Separate urgent issues from planned improvements and agree the scope.
-
Step 3: Deliver
Carry out the agreed work with a clear point of coordination.
-
Step 4: Review
Document what has changed and consider the next priorities.
Scope and costs
Know what is included
Cloud consumption, licences and third-party tools are separately charged. Availability, recovery and spend targets require a specific design and do not amount to unconditional guarantees.
How work is scoped
-
Ongoing care. Routine care maintains an agreed existing environment. Support hours, onsite coverage and how urgent issues are handled depend on your agreement.
-
Scoped projects. Material changes, such as migrations, security rollouts, new offices or a new website, are scoped separately with their own plan, acceptance criteria and handover.
-
Third-party costs. Licences, cloud consumption, third-party products, advertising spend and hosting costs are identified in the relevant proposal rather than assumed to be included.
Questions you may have
Still have a question? WhatsApp us (opens WhatsApp)
Can you review existing Azure costs?
A scoped review can examine usage, configuration and ownership. Any potential reduction depends on workload requirements and commitments.
Is ongoing cloud management included?
Only if it is expressly agreed. Implementation and continuing operations are separate responsibilities.
Next step
Discuss the next step
Tell us what you want to improve, what you have in place today and any important constraints. We can discuss whether this service fits your needs and what should happen next.
Prefer to talk first? +44 20 3951 6599WhatsApp us (opens WhatsApp)



